Details: providing and applying tack coat on the prepared surface with bitumen emulsion as per is: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of mort&h specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared surface with specified graded crushed stone aggregates as per table 500-4, grading-ii for base/ binding course, loading of aggregate with f.e. loader, heating and mixing of stone aggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with pow
Sector: RDPR