Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, all works up to any lead and lift, as directed by the engineer-in-charge : in all kinds of soil providing and laying at or near ground level factory made kerb stone of m-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per directions of the engineer-in-charge. [notes: (1) length of finished kerb edging shall be measured for payment. (2) precast c.c. kerb stones shall be approved by the engineer-in-charge.] supplying and stacking at site : good earth painting with synthetic enamel paint of approved br
Sector: Custom1