Description: Construction of Musto type benchmark MTBM at 15 Nos Telemetry sites and 04 Nos sites under Chambal Division CWC Jaipur Name of Work Construction of Musto type benchmark MTBM at 15 Nos Telemetry sites and 04 Nos sites under Chambal Division CWC Jaipur
Details: Description Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not excedding 1.5 m in widths or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of Soil Providing & laying in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level :- 1:5:10 (1 cement : 5 coarse sand (Zone-III) : 10 graded stone agreggated 40 mm nominal size. Providing & laying in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (ZoneIII) : 4 graded stone aggregated 40 mm nominal size. Brick work with common burnt clay FPS (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in
Sector: Water Resource Department