Description: 8 Providing and fixing Interlocking Tiles at Various Places in UIT Area Chittorgarh Name of Work 8 Providing and fixing Interlocking Tiles at Various Places in UIT Area Chittorgarh
Details: Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils M-30, 60 mm thick to be used in non traffic areas like building premises, monument premises, land scapes, public gardens/ park, domestic drives, paths and patios, Embankment slopes, sand stabilization Area etc.( As per table 1 of IS 15658:2006 Category ‘C’not denated on any it’s faces like Hexagon, Rectangular, square shape as per IRC SP 63:2004 Plain Cement Concrete 1:3:6 with 40mm nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by including curing for 14 days. (MoRTH specific
Sector: Urban Authority