Description: Construction of Various BT road Under UCRV Scheme in Barmer Distt Package No RJ 05 37 UCRV 2023 24 Name of Work Construction of Various BT Road under UCRV Pkg No RJ 05 37 UCRV 2023 24
Details: Construction of BT Road Bhata To Gogaji Dhora Km. 0/0 to 3/800Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2) Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) Construction of Subgrade and Earthen Shoulders
Sector: PWD