Description: Construction of Road From A R Jhareliya Name of Work Construction of Road From A R Jhareliya
Details: Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201).BY MECHANICAL MEANSIn area of Light Jungle. Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth. (MoRTH specification : clause 301 to 305).By Hydraulic Excavator CK-90 of 0.9 bucket capacity and tipper with disposal upto 1000 mtrs. Earthwork in excavation in ordinary rock, including stacking / disposal of surplus Material exclusive of compensation of earth. (MoRTH specification : clause 301 to 305).By Hydraulic Excavator CK-90 of 0.9 bucket capacity and tipper with disposal upto 1000 mtrs. Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading
Sector: PWD