Details: renovation work in rajiv gandhi seva kendra village ranikalan ranakma 61 particulars rcc roof top ramming and collection of broken material on the ground floor. cement concrete 1 : 2 : 4/1 : 15 : 3 pouring and supplying of the mixture to the prevailing cement concrete, pressing, leveling and leveling the surface with 1: 3 cement mortar on roof slabs, balconies, beams, lintels etc. etc. with punctuation but the cost of steel and shuttering separately. ratio 1 : 1.5 : 3 stone clay wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade : wo or more coats on riew work including preparation of base with primer , purty , 12019 fppy complete in all respect . rcc for work, the work of cutting, weaving and putting iron in place and tying may be done directly on top of the block of supply or r.c.c. roof
Sector: RDPR