Details: From the verandah in the large crematorium to the mine Pokhar 142522 Date: Four walls And raising the wall 26.11.2019 Earthen and earthwork work Cincinnian large cremation in line with main gate 1942521 Date: On the farm side of the four walls and 26.11.2018 Building up the wall farther and farther, four walls of Cincini Cemetery. Ruacha 1142519 Dated Uchana Namaz Tu Dinshade Construction 26.11.2018 Work Cincini Murda Moshi Shibhim Development Work 142518 Dinak Cincini 26.11.2018 Mashan Development Work Koli Samaka (14265 dated Cincinni 26.112019 Drain Nifari HT 1-156 Dinak R 27112019 Samadhi Barpani SBIABO Dinka Bhak Drain Entity SINASNI 122062079 4. 5 6 Mann 2205AVIR INISA
Sector: Zilla Parishad