Description: CONSTRUCTION OF VARIOUS MISSING LINK ROADS IN COMPLIANCE OF CM BUDGET ANNOUNCEMENT 2025 26 UNDER PACKAGE NO RJ 16 27 MISSING LINK BA 2025 26 NAME OF WORK CONSTRUCTION OF VARIOUS MISSING LINK ROADS IN COMPLIANCE OF CM BUDGET ANNOUNCEMENT 2025 26 UNDER PACKAGE NO RJ 16 27 MISSING LINK BA 2025 26
Details: CONSTRUCTION OF MISSING LINK ROAD FROM AMARSAR TO NAYAN PART - A : ROAD WORKClearing grass and removal of up to a distance of 30 m outside the periphery of the area as per MoRTH Specification Clause 201. By Manual Means Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and found
Sector: PWD