Details: earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor s density with initial lift of 1.5m (excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.with lead beyond 250 m and up to 750 m ( km) supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete. plastic bag empty bag of 50 kg capacity in good condition plastic / polythene labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) by loading transporting earth filled cement bags dropping at required locations in water including lead up to
Sector: Water Resource Department