Details: providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406. by mechanical means with all lead providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502 providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned wit
Sector: PWD