Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means. in area of non-thorny jungle rehabilitation of non patchable road fatehpur to salasar km.24/0 to 28/0 rehabilitation of non patchable road a/r to bari km. 0/0 to 4/500 rehabilitation of non patchable road bari to dinarpura km. 0/0 to 4/00 excavation in soil with dozer with lead upto 100 mexcavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. rehabilita
Sector: PWD