Details: name of work cc construction work in the square of moli mata temple earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301. in all type of soil providing and l
Sector: RDPR