Details: removal of unsuitable soil including excavation, loading and disposal upto 1000m lead but excluding compaction ground supporting embankment sub grade replacement by suitable soil, which shall be paid separately as per clause 305.3.4 as per morth specification clause 301.3.11 demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar. carriage of earth sand line murom with all leads providing and laying in position cement concrete including curing, compaction etc complete in specified grade excluding the cost of centering and shuttering- all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m20
Sector: Urban Authority