Details: installation of transformer supply installation testing & commissioning of star rated copper wound distribution transformer ( all the distribution transformer must be star rated as per notification of (bee) ministry of power,goverenment of india) of following rating 11/0.433kv delta-star connected, vector group dyn 11, onan cooled & as per bee star level- 2 & bis approved as per is 2026-1977 & losses as defined as per is 1180 part i 2014. including standard accessories like conservator, silica gel breather,bucholz relay, radiator, fins, ht cable box & lt cable boxes, off -ltc (+5% to - 10% @ 2.5%)temperature rise of 40 degree c in oil / 45 degree c in winding , isi marked drain valve, dial type temperature gauge, first filling of transformer oil as per is :335-1953 , epoxy based paint, including carrying of pre-commission testing & charging of transformer complete in all respect. nabl accredeated / cpri/ erda lab testing reports with oem certificate must submitted to engineer in charg
Sector: Water supply and Sewerage