Details: dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per morth specification clause 202. by mechanical means reinforced cement concrete earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per morth specification clause 301 to 305. providing and laying cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per morth specifica
Sector: PWD