Details: fitter (grade 1) assistant fitter or 2nd class fitter sweeper carriage of material building stone metal (grit and ballast etc.) including loading and unloading with all lead filling of sunk portion of roof with earthen pots of required height including filling voids with 1:3:6 light concretee, using brick bats complete levelling and dressing the surface by 50mm thick cement concretee 1:2:4 as per specification. cement concretee flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete. 75mm thick with 20mm thick nominal size aggregate. plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. making holes in stone masonry wall upto 450 mm x 450 mm size and making good in cm 1:6. demolishing cement concretee manually/ by mechan
Sector: PWD