Details: earth work earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. 1) in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. 1) depth upto 1.5 m 2) add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 concrete work providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 8) 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) 3) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) providing and laying damp-proof course with cement concrete grade m-15 (1 :
Sector: RDPR