Details: dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead :of area 3 square meter and below.(b-66/14.12.1) dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead. (b-14.55) demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. (b-14.3) (b-14.23.1) dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead:for thickness of tiles 10mm to 25mm. (b-14.2.2) demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. 1: 4: 8 or leaner mix. "supplying and filling in
Sector: Power Sector