Details: part a :- clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50m outside the periphery of the area cleared surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of lead upto 50 mtr. and lift upto 1.5 mtr. : all kinds of soil. ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same: all kinds of soil.
Sector: Water supply and Sewerage