Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-incharge in cement mortar carriage of materials by manual labour including loading, unloading and stacking for lead less than 0.5 km earth providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). providing and laying in position cement concrete of specified grade excluding the c
Sector: RDPR