Description: Providing laying and jointing of Gravity line at village Shimbu ka burj under JEN Sec Gadhiala under Sub Dn Bajju Name of Work Providing laying and jointing of Gravity line at village Shimbu ka burj under JEN Sec Gadhiala under Sub Dn Bajju
Details: Part – A. Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.: All kinds of soil Providing, lowering, laying and jointing in trenches, standard lengths ISI marked AC pressure pipe class 15 manufactured by MAZZA process as per IS-1592-2003 or amended up to date with AC coupling and EPDM Rubber sealing rings of Type -3 as per IS: 5382/1985 (Reaffirmed 1998) or amended up to date, including all taxes , transportation and freight charges, inspection charges, loading/ un
Sector: Water supply and Sewerage