Description: E NIT 10 I II 2025 26 WORK NO 01 Name of Work Name of Work
Details: Excavation in Cutting in Soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per MoRTH Specification Clause 301.3 Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. Carriage of Earth sand line Murom with all leads P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2.) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant. 110 mm dia
Sector: Urban Authority