Details: construction of foundation / inaugration pedastal in 23 cm thick brick masonry in cm 1:4 of size 1.40m x 1.80m above ground level with adequate foundation including providing and fixing of granite stone of size 0.50 to 1.00 sqm with engraving letters and figures,cement plaster,white washing etc. complete as per direction of engineer in charge. excavation in soil using hydraulic excavator and tippers with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per morth specification clause 301.3 excavation in ordinary rock using hydraulic excavator and tippers with disposal upto 1000 mexcavation for roadway in ordinary rock with hydraulic excavator of 0.9 bucket capacity including cutting and loading i
Sector: PWD