Details: of 11 kv line 31.5 km and 11/0.4 kv ub station for releasing of 125 nos agriculture connection under (o&m) sub division aau under phalodi circle including transportation of material from s/d store to site on labour rate basis-2022 conducting route survey as per approved route map and of route with tee off point section point & double pole locations. excavation of pit in soil (ordinary) to various supports and stay sets including stacking of excavated soil from the edge of excavation.(15 % extra shall be payble for the designated desert area panchayat samities of jodhpur discom in pursuance to jdvvnl order no. 1240 dt. 18.07.13) (a) height of poles/r.s.joist/m.s. rail size of pit 9 mtr/ 1.2mx0.6mx1.50 m deep (c)stay set/depth of pit 6'x 5/8" -0.75x0.5x1.35 m excavation of pit in hard soil (a) height of poles/r.s.joist/m.s. rail size of pit 9 mtr/ 1.2mx0.6mx1.50 m deep (c)stay set/depth of pit 6'x 5/8" -0.75x0.5x1.35 m excavation of pit in ordinary rock which does not require
Sector: Distribution