Details: part "a" road work earthwork in excavation for roadway in soil, including stacking / disposal of surplus material exclusive of compensation of earth (morth specification : clause 301 to 305). by hydraulic excavator ck-90 of 0.9 bucket capacity and tipper with disposal upto 1000 mtrs. earthwork in excavation in ordinary rock, including stacking / disposal of surplus material exclusive of compensation of earth (morth specification : clause 301 to 305). by hydraulic excavator ck-90 of 0.9 bucket capacity and tipper with disposal upto 1000 mtrs. construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted by vibratory roller 8-10 tonne to meet requirement of tale 300-2 as per morth specification : clause no. 305 construction of embankment with approved materia obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slopeand