Details: part - a - ew & dismantling work construction of reference bench mark (1 no.), working bench mark (4 nos.) and near all drainage structures and bridges (as per direction of engineer-in-charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete each pillar to be painted with with a unique identification no and directional information as per morth specifications cl. 109. dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per morth specification clause 202. excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades a
Sector: PWD