Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.depth upto 1.5 mhdpe200 mm dia providing and fixing barricading at site of work for restricting the general public using 40 mm dia m.s. pipe ("b" class) as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing suitably two rows of 100 mm wide pvc tape preferabley of red colour. the m.s. pipe shall be painted in red and white colour strips as p
Sector: RDPR