Details: unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to store as direction, receiving repaired / new pump set from store/ divisional store , testing the same, transportation to site and lowering back into tube well along with submersible cable, lowering pipes, specials etc and commissioning of the tube well. the job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of job or fault/problem if any. for three phase pump set g.i. double flanged pipe lowering assembly of nominal dia 50 mm 65 mm 80 mm hdpe pipe lowering assembly of nominal dia 63 mm 75 mm for single phase pump set g.i. double flanged pipe lowering assembly of nominal dia 32 mm hdpe pipe lowering assembly of nominal dia 32 mm only unlo
Sector: Water supply and Sewerage