Details: earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305). in ordinary soil mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =all up to plinth level 1:4:8 (1cement :4 course sand :8 graded stone aggregate 40 mm nominal size providing and laying m30 grade controlled cement concrete pavements including mixing and vibrations concrete with necessary needle vibrators and surface with screed board vibrating complete in all respect with 20/25 mm stone aggregate (crusher broken) including anti-skid textured finish to required camber/ super elevation and grade including curing etc. as per specification with cement concrete m-30 grade including cost of steel frame work for s
Sector: Urban Authority