Details: earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301. earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301. in all type of soil construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per mort&h specification clause 305. (lead taken upto 5 km) providing, laying and spreading of granular sub-base by providing coarse
Sector: RDPR