Details: supplying and stacking good earth at site of work.note: 1) loading, unloading and carriage to be paid extra as per actual lead. 2) earth measured in stacks will be reduced by 20% foe payment supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in-charge including screening and stacking grassing with 'doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed. (the good earth shall be paid separately) in rows 15 cm apart in either direction supply and planting following in poly bags / earthen pots well branched, well established & free from disease of 300 mm min. height ground covers at site in 0.3 m dia holes, 0.3 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as require. wedelia trilobata ( sunflower family) supply and planting following
Sector: RDPR