Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering and ramming and disposal of surplu excaveted soil as directed with in a lead of 50 meters. all kinds of soils. (bsr_b1/44 i. no. 1.8) providing and laying in position cement concrete including curring compaction etc.in specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:4:8 (1 cement : 4 course sand : 8 graded stone aggregate 40mm nominal size ) (bsr_b3/54 i. no. 3.1.6) random.rubble.stone masonry for with hard stone in foundation and plinth in cement sand mortarr above 30cm wall in cement mortar 1:6 (1 cement:6 sand) (bsr_b6/69 i. no. 6.1.6) supplying and filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete incl
Sector: Water supply and Sewerage