Details: earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of engineer for following depths, below naturalground / road top level. 4.10.1 in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.4.10.1.1 depth upto 1.5 m carriage of materials by mechanical transport including loading, unloading and stacking ::1.1.1 earth 4 km providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level :21.1.7 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). 21.1 providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 21.1.3 1:2:4 (
Sector: RDPR