Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting.(a) ordinary excavation including loading ,unloading,disposal and dressing of excavated eartth/rock within initial lead of 50m and lift upto 1.5 m in dry moist including dressing of excavated area ,dewatering wherever required complete in all respect a. soft/disintegrated rock (20%) b. hard rock not requiring blasting (20%) c. phylite & other hard rock requiring nominal blasting (30%) d. hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with
Sector: Water Resource Department