Description: MANOHARA TALAB PER MUTRALAYA NIRMAN KARYA Name of Work MANOHARA TALAB PER MUTRALAYA NIRMAN KARYA
Details: Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1
Sector: RDPR