Details: part a civil work based on pwd bsr 2022 for jaipur circle) earth work in excavation by mechanical means (hydraulicexcavator )/ manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) includingdressing of sides and ramming of bottoms, lift upto 1.5 m,including taking out the excavated soil and depositing andrefilling of jhiri with watering & ramming and disposal ofsurplus excavated soil as directed with in a lead of 50 meter.all kinds of soils supply & stacking good soil of earth at site completeincluding loading unloading & transportation etc.good soil of earth filling available excavated earth (excluding rock) in trenches,plinth side of foundation etc. in layers not exceeding 20 cm. indepth, consolidating each deposited layer by ramming andwatering including lead up to 50 meter and with all lift. providing and laying in position cement concrete includingcuring, compaction etc. complete in specified grade excludingthe cost of centering and shutt
Sector: School