Description: Construction of Dome at nilkanth balaji Name of Work Construction of Dome at nilkanth balaji
Details: Earth work in excavation in foundation, trenches manholes, roads side chambers etc including dressing of sides and ramming of bottom, including getting out the excavated material, refilling after laying pipes/foundation, dewatering and disposal of excavated material at a lead up to 50 m suitable site as per direction of Engineer for following depth, below natural ground/Road top level, (Depth from Av. GL to 1.5m depth), For Footing, Total Earth Work Quantity Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m., Area Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level in 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size)., For Footing
Sector: RDPR