Details: supplying filling and stiching of empty cement bags with earth available at site, weight not less than 40 kg including excavation etc. complete plastics bags. labour charge for making coffer dam/ring bund by loading transporting earth filled cement bags droping at required location in water including all lead and lift complete excluding cost of empty cement bags ;oacing in water. removal of slit/soil/earth, sand, pebbles, malba , debris, , stone pebbles and obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect for depth above 30cm. removal of slit/soil/earth, sand, pebbles, malba , debris, , stone pebbles and obstr
Sector: Irrigation