Details: name of work construction of pakka 58 no earthen chekdam with westweire pmksy 2 0 block newai tonk as per bsr specification dag belling 2.50 to 5.00 cm(gkn-2024 bsr item no-6b) scrapping of grass and shrubs ( item no-24 ch-v wrd bsr 14-08-2023 tonk less 10% c.p. ) excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m inclu
Sector: Irrigation