Details: silt clearance of drains, channels and canals with lift 1.5 mtr and lead up to 50 mtr. hire charges include cost of services of operating staff, cost of lubricating oil, diesel / petrol/ kerosene oil, other consumables for running the plant and machinery and excluding gst hydraulic excavator of 1 bucket carriage of materials by mechanical transport including loading, unloading and stacking :: sand, bazri, ballast, kankar upto 3 km
Sector: RDPR