Details: part 'a' bridge work dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per morth specification clause 202. by mechanical means cement concrete earthwork in excavation for structures as per drawing and morth specifications clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bot
Sector: PWD