Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : all kinds of soil providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m20 grade nominal mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). providing and fabricating reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('original producers' who manufacture bill