Description: WORK TENDOR Name of Work
Details: civil work Soil filling work: Digging a pit in the road and lifting 1.5 meter of soil, breaking 50 meter lead pile, laying it in 25 cm layers, leveling it with ramming, casting camber, cambering and grading the designated surface of the road in soil including 5 km of load, laying the material, ramming and widening with 8-10 tonne roller, laying the material, pouring water
Sector: RDPR