Details: silt clearance of drains, channels and canals with lift 1.5 mtr and lead up to 50 mtr. pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. carriage of materials by mechanical transport including loading, unloading and stacking ::with in 3.0 km including loading etc. earth
Sector: RDPR