Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, depth upto 1.5 m construction of embankment with approved material obtained fromborrow pit with all lifts and leads, transporting to site, spreading,grading to required and compacting by vibratory roller 8-10tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as permort&h specification clause 305. (lead taken upto 5 km) providing, laying, spreading and compacting of granular sub-base by providing close graded material (table 400-1), spreading in uniformlayers with motor grader on prepared surface, mixing
Sector: RDPR