Details: earth work in excavation in open area, stp, wtp, pumping station with mechanical means including dressing of sides and ramming of bottoms, including getting out the excavated material, disposal of excavated material lead upto 1000m at suitable site as per as per drawing and as per direction of engineer. (measurements for payment to be done as per standard drawings).above 3.0 m and upto 6.0 m depth clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to a lead of 50 metres from road boundary including removal and disposal of top organic soil not exceeding 150 mm in thickness as directed by engineer.in area of light jungle silt clearance of drains, channels and canals with lift 1.5 mtr and lead up to 50 mtr. sludge clearance of drains, channels and canals with lift 1.5 mtr and lead up to 50 mtr. p
Sector: RDPR