Details: (2.4) dismantling of existing structures like culverts,ridges, retaining walls, cc road and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable materialwith all lifts and lead of 50 metres as directed by engineer. (2.4.1) lime concrete, cement concrete grade m-10 (1:5:10) and below (2.4.2) cement concrete grade m-15 and above and pcc blocks (17.1.1.1) earth work for sewer line and manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level including allowances for any additional excavation beyond t
Sector: RDPR