Description: CC WORK IN PLOT NO A 17 TO A 22 AND FROM FUEL JUICE TO AA 15 IN WARD NO 129 Name of Work 129 17 22 15
Details: (2.1) Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. 2.10.1 Bituminous courses (2.10.1) Bituminous courses (2.10.2) Granular courses (1.1.3) Carriage of Materials by mechanical transport including loading, unloading and stacking Stone, boulders, gravelly material Beyond 5 Km upto 10 Km. per Km. (9.1) Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing an
Sector: RDPR