Details: part-a demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineer-in-charge. grading roof for water proofing treatment with water proffing compound cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) internal finishing: distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding:new work (two or more coats) over and including scrapping and priming coat with cement primer. repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of to the dumping ground within 50 m lead with cement mortar 1 :4 ( 1 cement : 4 coarse sand) providing and laying in position cement concrete including curing, compaction et
Sector: School